Skip to content
MissionChief UK Operational Field Guide
Guide online TKB Games

Account Readiness Planner

Build a local-only readiness scenario from the canonical UK mission catalogue, then compare the published requirements with the operational inventory and protected reserve that you enter.

1. Build the reference scenario

Loading canonical mission data…

2. Enter deployable inventory

Dispatchable units means correctly staffed, trained and usable units. Protected reserve defaults visibly to zero and is subtracted from incident cover. Leave dispatchable or personnel values blank when they are unknown.

Add at least one mission to create the inventory worksheet.

3. Review readiness

No scenario selected.

4. Save or transfer the scenario

Nothing leaves this browser unless you explicitly export a JSON file.

The calculation keeps each evidence type separate:

  1. Guaranteed resources are added across selected missions and concurrency.
  2. Alternative groups are allocated with a capacity-aware flow calculation, so one unit is not silently reused across several independent groups.
  3. Required incident personnel are added across the scenario.
  4. Available-before-generation personnel use the highest published threshold for each role rather than being added as dispatch demand.
  5. Trailers and containers are checked against published compatible towing or carrier resources in a separate logistics calculation.
  6. Recovery assets are reported as car or truck clearing workload, not converted into fictional emergency-vehicle rows.
  7. Probabilistic, conditional, ranged and average-minimum fields remain advisory evidence and do not become exact gaps.
StateMeaning
ReadyEvery exact requirement with relevant inventory data is covered after protected reserve
WatchNo definite exact gap is proven, but one or more inventory values or non-exact evidence fields remain unresolved
DegradedAt least one exact guaranteed, alternative, personnel or towing requirement has a definite shortfall
UnavailableNo mission scenario has been selected

The planner does not model travel time, station routing, hospital or custody turnaround, incident duration, staff assignment rules, dispatch substitution that is not canonical, or whether a towing vehicle can simultaneously satisfy another response role. Use Station Placement for geography and the Concurrent Fleet Planner for a simpler published-requirement multiplier.