Operations BoardMission dossiers, regions and reward intelligence
Current buildBuild 0.3.1.12
DrainSim Construction Site Guide | Walkthrough, Rewards & Tips
Complete DrainSim Construction Site guide with a mission walkthrough, deployment strategy, rewards, completion regions, equipment planning and troubleshooting.
A complete Construction Site mission guide covering the walkthrough, deployment order, rewards, completion regions, equipment planning and common mission problems.
This DrainSim Construction Site guide explains the full mission walkthrough, recommended deployment strategy, completion regions, rewards, equipment planning and troubleshooting for the current game build.
Reroute incoming street water towards lower-elevation drains and protect excavation pits. Use the mission data below to check the reward, measured regions, infrastructure and target time before choosing your loadout.
Reroute incoming street water towards lower-elevation drains and protect excavation pits.
Deployment order: Bring a heavy but organised loadout: multiple buckets, shovel, barriers, pumps, generators and cleanup tools. Open the upper drains before the excavation pits become the only available storage.
Reduce the volume reaching the excavation before it spreads across the site.
Move uphill immediately and open the highest drains.
Use multiple buckets to expand available dirt handling.
Mark the crane, forklift and western pit regions for repeat checks.
02
Phase 2 — Shape the site
Use trenches and dirt placement to steer water instead of trying to block every inflow.
Cut continuous channels towards lower-elevation drains.
Use dirt to close unwanted branches and seal barrier ends.
Test each route with live water before extending it across the site.
03
Phase 3 — Protect and drain the pits
Keep excavation regions from becoming permanent reservoirs.
Deploy barriers to redirect water around the most vulnerable pits.
Use pumps and generators in stable positions outside active dig routes.
Prioritise the crane, forklift and western pit areas when water continues returning.
04
Phase 4 — Resolve thin residual water
Close all eleven regions after the major flows are controlled.
Use the scanner rather than visual judgement alone.
Vacuum shallow water around machinery, pit edges and uneven terrain.
Recheck any region that clears and then returns after a save, reload or route change.
Mission Walkthrough Video
Watch a complete Construction Site play guide demonstrating one effective route through the mission. Equipment behaviour, timings or mission mechanics may change between DrainSim updates.
Follow the mission walkthrough in this guide: establish water control first, work through each measured completion region in order, then finish shallow water and recheck the cleared areas before ending the mission.
How many completion regions are in Construction Site?
Construction Site has 11 completion regions that must be cleared before the mission can finish.
What reward does Construction Site give?
The base mission reward is 3,500.
What should I focus on first in Construction Site?
Start with the deployment order shown in the Mission Briefing. Secure the main drainage or discharge route before spreading equipment across the rest of the map.