Tutorial
Learn the complete tool sequence: pipes, drains, power, digging, pumping and final cleanup.
- Reward
- 1,300
- Rating inputs
- 8 / 30
- Infrastructure
- 61 ordered objectives
Current mission rewards, region counts, advance intel and source-labelled community time targets.
Rewards and internal rating bounds come from build 0.3.1.12 mission metadata. Community times are older field reports, not confirmed five-star limits.
Learn the complete tool sequence: pipes, drains, power, digging, pumping and final cleanup.
Use the city drains and canal-adjacent routes while clearing the flooded cafe and back alley.
Multiple drainage routes; diggable ground can redirect water and the stream can receive discharge.
Prepare for deep water across multiple lots and interior service areas.
Deep roadside flooding, large diggable areas and limited light at the start of the shift.
Continuously flooded streets and three interactive wall grates aligned along the garage structure.
Ten-minute preparation window before the canal breach floods the area.
Close leaking pipes early, then move water towards the four low street sectors.
Two placed drain boosters sit near utility boxes; activate station infrastructure before final cleanup.
Reroute incoming street water towards lower-elevation drains and protect excavation pits.
RatingMin and RatingMax are exact fields in the shipped mission metadata. This guide calls them internal rating inputs because the current extraction does not prove:
Downtown Station and Construction Site contain older or generic bounds in their placed controllers. Their current mission metadata is shown on the board, while the conflicts remain recorded.
The historical community par times come from a Steam guide updated on 13 April 2026. The guide predates build 0.3.1.12 and does not cover Downtown Station or Construction Site. They are useful field targets, not official or file-confirmed thresholds.