A complete Tutorial mission guide covering the walkthrough, deployment order, rewards, completion regions, equipment planning and common mission problems.
This DrainSim Tutorial guide explains the full mission walkthrough, recommended deployment strategy, completion regions, rewards, equipment planning and troubleshooting for the current game build.
Learn the complete tool sequence: pipes, drains, power, digging, pumping and final cleanup. Use the mission data below to check the reward, measured regions, infrastructure and target time before choosing your loadout.
Learn the complete tool sequence: pipes, drains, power, digging, pumping and final cleanup.
Deployment order: Use the supplied equipment and follow the objective order. The Tutorial deliberately teaches the dependencies between drains, power, pumps and final shallow-water cleanup.
Open the map, identify the marked water zones and clear the blocked drains before moving equipment.
Use bubbles, floating debris and mud sounds to locate hidden drains.
Rake each drain until the objective confirms sufficient clearance.
Recheck drains after water begins moving; they can collect more mud during the operation.
02
Phase 2 — Repair and establish power
Close the broken pipe and create a working power network.
Use repeated pipe-wrench strokes until the pipe-repair objective completes.
Place the generator on stable ground and connect the site light.
Keep cable runs simple and avoid stretching them across awkward height changes.
03
Phase 3 — Shape the route and deploy the pump
Use the shovel and bucket to create a controlled path, then move deep water through the pump and hose.
Follow the marked digging objective rather than removing dirt at random.
Place the pump in the deepest usable water and route its hose to the instructed discharge point.
Connect the pump to the generator only after both pieces are positioned.
04
Phase 4 — Clear residual water
Finish every measured region with the vacuum and squeegee.
Use the water scan to find the remaining red zones.
Vacuum shallow pockets rather than attempting to use it in deep water.
Push thin surface water towards drains with the squeegee and revisit all three regions.
Mission Walkthrough Video
Watch a complete Tutorial play guide demonstrating one effective route through the mission. Equipment behaviour, timings or mission mechanics may change between DrainSim updates.
Follow the mission walkthrough in this guide: establish water control first, work through each measured completion region in order, then finish shallow water and recheck the cleared areas before ending the mission.
How many completion regions are in Tutorial?
Tutorial has 3 completion regions that must be cleared before the mission can finish.
What reward does Tutorial give?
The base mission reward is 1,300.
What should I focus on first in Tutorial?
Start with the deployment order shown in the Mission Briefing. Secure the main drainage or discharge route before spreading equipment across the rest of the map.