Skip to content
MissionChief UK THE TKB FIELD GUIDE

PERSONAL COMMAND DESK

Pick up exactly where you left off.

CURRENT PAGE MissionChief UK Guide
SAVED

Command Bookmarks

    Save missions, vehicles, training pages and planning tools for instant return.

    HISTORY

    Recently Viewed

      Pages you visit will appear here automatically.

      Stored only in this browser. No account, tracking profile or offline copy is created.

      UK guide TKB Games

      Flood and water rescue: pumps, boats and rescuers

      Water removal, access to casualties and specialist rescue teams are separate capabilities.

      In this chapter
      1. Separate the three tasks
      2. Understand the pump fields
      3. Trailer compatibility is operational capacity
      4. Recommended test and diagnostic checklist
      5. Where to expand next

      Separate the three tasks

      A flood incident may require pumping water, rescuing people and transporting patients. Those tasks should be planned separately even if they happen at the same location. A boat does not establish pump capacity, and a large pump does not establish a qualified flood-rescue team.

      Our recommended first step is a small water-removal capability that you can dispatch reliably. Add technical or flood rescue only when the required carriers, staff and medical support are ready. Inspect which new mission variants the extension introduces before deciding it is a harmless parking upgrade.

      Understand the pump fields

      Flooded Basement (611) lists minimum pump capacity of 1,000 and water to pump of 20,000. Its requirements include a Water Damage Pump Extension and four Fire Stations. These are different quantities: the minimum capability needed at the scene and the amount of work to remove.

      Flooded Railway Station (809) demonstrates the combined workload. It lists minimum pump capacity 1,500 and 90,000 water to pump, two Flood Rescue Units and a Water Damage Pump Extension. The incident also includes railway personnel, EIU, ordinary fire and police resources, PRVs, SRVs, welfare and an Operational Team Leader.

      Trailer compatibility is operational capacity

      The official UK rescue-vehicle FAQ identifies Flood Rescue Unit as a trailer and names several compatible Coastguard and support vehicles. It lists Flood First Responder Training. It separately identifies the fire Boat Trailer, an L4V tow vehicle and Technical Rescue education.

      Do not generalise those relationships into a rule that every 4x4 can pull every rescue trailer. Check the exact pair in the live vehicle menu and test dispatch before relying on it. A trailer that shares a single busy tow vehicle with another critical resource cannot provide independent cover.

      Recommended test and diagnostic checklist

      • Confirm the selected pumping resources reach the displayed minimum capacity.
      • Check the actual work remaining instead of assuming the presence of a pump means immediate completion.
      • Confirm each rescue trailer has an available compatible vehicle and qualified crew.
      • Inspect patient requirements and plan ordinary medical transport alongside rescue.
      • For a rail or coastal flood, include its specialist police, command and access requirements.
      • Test another local incident while the main flood response is occupied.

      Where to expand next

      Use the observed shortage to choose the next purchase. Long waits before departure suggest a shared carrier or crew problem. A response that reaches the scene quickly but cannot start pumping suggests insufficient capability. Repeated waits after rescue suggest patient or destination capacity.

      Keep a record of the exact mission variant and a successful dispatch. That becomes a useful check after buying a new extension or changing an alarm rule. It also prevents an older simple-flood preset from being mistaken for a complete response to a newer multi-service flood.

      Sources and further reading

      Latest editorial change: Added an answer-first summary, action checklist and related planning/reference link. Detailed source dates remain independent.

      Official sources establish game rules; practical build orders and planning examples are TKB recommendations. Follow the UK game’s current requirement panel where a later update differs.

      1. Flooded Basement ↗
      2. Flooded Railway Station ↗
      3. UK rescue trailers ↗