Always required by the canonical mission record.
- 6×
- 3×
- 1×
Fire in turbine (Nuclear Power station) · Exact record 482/a · Published average 8,400 credits
Read these current quantities first. The capability interpretations retain their own older evidence dates. Conditional, probability and alternative requirements still depend on the live mission request.
| Requirement | Quantity | Published chance | Interpretation evidence |
|---|---|---|---|
| Fire Officer · battalion_chief_vehicles | 3 | No field published | 2026-07-23 |
| Foam Unit · foam | 1 | No field published | 2026-07-23 |
| Fire engine · firetrucks | 6 | No field published | 2026-07-23 |
{
"prerequisites": {
"main_building": 0,
"fire_support_count": 1,
"fire_stations": 8
},
"additional": {
"expansion_missions_ids": [
242
],
"filter_id": "firehouse_missions"
}
}No differences found in the compared requirement, probability, prerequisite, additional-condition and reward fields.
Inspect this record, unit matches and sibling variants → · Live mission help ↗
MISSION 482/a / FIRE & RESCUE
DISPATCH CONTRACT
Requirement types remain separate so possible demand is never presented as certainty.
Always required by the canonical mission record.
GENERATION PRESSURE
The recorded account estate that can activate this incident.
OPERATIONAL OUTCOMES
Recorded outcome ranges and dependencies; unavailable values remain unknown.
MISSION RELATIONSHIPS
EVIDENCE TRAIL